Construction Activities: 05/23/2022 – 05/27/2022
T-Bone Construction will continue installing the Water Lines as well as the Water Meter Pits. Construction Traffic will be light. Have a great weekend and stay warm.
Uncategorized / May 20, 2022 / Kahn Construction
T-Bone Construction will continue installing the Water Lines as well as the Water Meter Pits. Construction Traffic will be light. Have a great weekend and stay warm.
I hope that everyone was able to get through the arctic freeze with no...
The houses are looking great. We are continuing with installing the drywall in the...
We have started the stucco install on one of homes. Continuing to work on...
We are making great process on the houses. We have started to hang drywall...
The driveways to the houses have been poured. We are working on getting the...
Very exciting this week, driveways are going to start getting asphalt. We are in...
I hope that everyone was able to get through the arctic freeze with no...
The houses are looking great. We are continuing with installing the drywall in the...
We have started the stucco install on one of homes. Continuing to work on...
We are making great process on the houses. We have started to hang drywall...
The driveways to the houses have been poured. We are working on getting the...
Very exciting this week, driveways are going to start getting asphalt. We are in...