Construction Activities: 05.16.2022 – 05.20.2022
Installation of the Water Taps & Water Meters. Pump House Roof Tiling. Enjoy the Sunshine.
Uncategorized / May 13, 2022 / Kahn Construction
Installation of the Water Taps & Water Meters. Pump House Roof Tiling. Enjoy the Sunshine.
I hope that everyone was able to get through the arctic freeze with no...
The houses are looking great. We are continuing with installing the drywall in the...
We have started the stucco install on one of homes. Continuing to work on...
We are making great process on the houses. We have started to hang drywall...
The driveways to the houses have been poured. We are working on getting the...
Very exciting this week, driveways are going to start getting asphalt. We are in...
I hope that everyone was able to get through the arctic freeze with no...
The houses are looking great. We are continuing with installing the drywall in the...
We have started the stucco install on one of homes. Continuing to work on...
We are making great process on the houses. We have started to hang drywall...
The driveways to the houses have been poured. We are working on getting the...
Very exciting this week, driveways are going to start getting asphalt. We are in...