Construction Activities: 09.05.2022 – 09.09.2022
Looking forward to underground gas install. Getting the road prepped for paving in the future.
Minimal Traffic
Enjoy the Holiday Weekend
Uncategorized / September 2, 2022 / Kahn Construction
Looking forward to underground gas install. Getting the road prepped for paving in the future.
Minimal Traffic
Enjoy the Holiday Weekend
I hope that everyone was able to get through the arctic freeze with no...
The houses are looking great. We are continuing with installing the drywall in the...
We have started the stucco install on one of homes. Continuing to work on...
We are making great process on the houses. We have started to hang drywall...
The driveways to the houses have been poured. We are working on getting the...
Very exciting this week, driveways are going to start getting asphalt. We are in...
I hope that everyone was able to get through the arctic freeze with no...
The houses are looking great. We are continuing with installing the drywall in the...
We have started the stucco install on one of homes. Continuing to work on...
We are making great process on the houses. We have started to hang drywall...
The driveways to the houses have been poured. We are working on getting the...
Very exciting this week, driveways are going to start getting asphalt. We are in...