Construction Activities: 04/11/2022 – 04/15/2022
Preparing the Pump House for the Roofers to come out next week. Electrician will be onsite Saturday, 04/16/2022. Minimal Traffic.
Uncategorized / April 15, 2022 / Kahn Construction
Preparing the Pump House for the Roofers to come out next week. Electrician will be onsite Saturday, 04/16/2022. Minimal Traffic.
I hope that everyone was able to get through the arctic freeze with no...
The houses are looking great. We are continuing with installing the drywall in the...
We have started the stucco install on one of homes. Continuing to work on...
We are making great process on the houses. We have started to hang drywall...
The driveways to the houses have been poured. We are working on getting the...
Very exciting this week, driveways are going to start getting asphalt. We are in...
I hope that everyone was able to get through the arctic freeze with no...
The houses are looking great. We are continuing with installing the drywall in the...
We have started the stucco install on one of homes. Continuing to work on...
We are making great process on the houses. We have started to hang drywall...
The driveways to the houses have been poured. We are working on getting the...
Very exciting this week, driveways are going to start getting asphalt. We are in...